Skip Nav

Planter Setup Quick Reference

04/14/2014
John Deere Farmsight


GreenStar™ 3 2630 General Setup Measurements/offsets Refer to Section 45 of the GreenStar 3 2630 OM
  Guidance setup Refer to Section 50 of the GreenStar 3 2630 OM
  Setup documentation Refer to Section 65 of the GreenStar 3 2630 OM
  John Deere Section Control setup Refer to Section 75 of the GreenStar 3 2630 OM
SeedStar™ XP Setup Initial system configuration Refer to Section 40 of Seed Star OM 
  Planter drive setup Refer to Sections 45 and 50 of the Seed Star OM
  Set Active Pneumatic Downforce Refer to Section 40 of Seed Star OM 
  Enhanced motor system setup Refer to Section 60 of  Seed Star OM
  Seed rate setup Refer to Section 65 of the Seed Star OM
  RowCommand™ setup Refer to Section 55 of Seed Star OM
  Main run screen review and setup Refer to Sections 70 and 75 of Seed Star OM
GreenStar™ Rate Controller Display Setup Setup of sections and  Refer to Sections 65 and 70 of the GreenStar
Rate Controller OM for planter setup and operation
  Height switch setup Refer to Sections 65 and 70 of the GreenStar
Rate Controller OM for planter setup and operation
Back to News
Archive   
2024   
2023   
2022   
2021   
2020   
2019   
2018   
2017   
2016   
2015   
2014   
2013   
2012   
2011   
Keywords   
Authors   
All Articles
X