Powering Into the Future | Wrapping Up a Generational Investment
11/08/2024
Cross Implement Inc
Powering Into the Future | Wrapping Up a Generational Investment
Over the Last 2 Years We Have Undertaken a Major Electrical Upgrade that Quadruples Our Service Capacity while Simultaneously Investing in a Solar Array Designed to Produce 125% of Our Energy Needs.
With the Future in Mind the Solar Array was Engineered in Such a Manner that We Can Easily Double the Generation Capacity all with Net Metering.
The Goal of the Project was to Create the Infrastructure Needed for Future Facilities Expansion & Achieving Energy Independence Now & In the Future